FIGURE 14-11
Assembly diagram
ASSEMBLE
06: Fit this bottom assembly into the back and
lock the vertical dividers into the bottom’s
pocketed grooves.
07: Place the sides, top, and front into place.
08: Place all four feet onto the legs.
09: Use blue painter’s tape to secure the parts
to each other.
10: Working around the Cabinet, predrill all
accessible holes on the front, top, and sides.
Refer to “How to Drill” on page 206.
11: Screw in fasteners by hand.
12: Predrill and screw in fasteners on the feet.
Refer to Figure 10-11.
13: With assistance, pivot the Open Storage
Cabinet to turn it upright.
14: Finish predrilling and screwing in fasteners
on the back.
15: Remove the blue painter’s tape.
FIGURE 14-12 Open Storage Cabinet finished and
upright
290
DESIGN FOR CNC
    "