XC3000S Series Laser Cutting
System Commissioning Manual
Example 2:
Requirements:
1、The existing machine configuration is as follows:
Panasonic servo motors 4, respectively for X, Y, Y1, Z axis, an EDS board, you need to connect all the
limit signals according to the standard points, the network cable connection order is Y, X, Y1, Z,
EDS3000 board, delete the nodes in the current configuration area and create a new configuration,
backup the new configuration in order to import to other replicators with the same configuration.
Process:
1 )Open the configuration tool and input the password: 4006701510 to delete the previous configuration
node through the operation in subsection 4.2.1.
Add 4 Panasonic Servos and one EDS3000 board to the blank configuration and adjust the position
according to the actual network cable connection order.
11