(5) One of the two quartz pipes should be stored for standby application, and the other one should be installed in the
machine after opening the sealing plates on both ends of the host machine. During the installation, high-temperature wires
on both sides should be connected with the quartz pipe. Please screw down the coppery nut and cover the magnetic head.
(A: quartz pipe B: white high-temperature wires C: support of the quartz pipe D: rubber roller)
Please do not connect power supply
when installing the quartz pipe!
(6) Please install the oil-water separator on the outer side of the right rack feet of the machine, connect the output pipe of the
pneumatic pump with the left side of the oil-water separator, insert the air supply pipe from the connector on the right side
of the oil-water separator, and open the pneumatic pump to supply air for the equipment.
(7) Please install the left and right supports of the picture placing core axle. During installation, please ensure that the
supports should be tightly screwed and be parallel with the rubber roller platform.
5
    "