HSD
Block the shaft unit, using the six fixing screws
4.
(with a tightening torque of 12 Nm with cross-
tightening)
Close the reaction system, working in a radial
direction as shown in the figure
5.
Variation ES939: operation not necessary
Block the reaction system, using the eight fixing
screws. Remove the two M5x90 service screws
6.
Variation ES939: Reassemble the semi-rings
as at the beginning, blocking them with the
eight fixing screws
5801H0056 ______________________________________________________________ 140/183
    "