Send Quote Requests to info@automatedpt.com
Wiring
Call +1(800)985-6929 To Order or Order Online At Deltaacdrives.com
ASDA -A3
3
Bulkhead connector
The example here uses the bulkhead connector with the cable exit direction towards motor
shaft:
a
b
(D)
(C) (B) (A)
Step 1:
Cut through the cable and expose the
shielding. The exposed wire length (a)
should be 15 mm (0.59 inches) and the
tinned wire length (b) should be as follows:
For encoder cables / brake cables:
1.5 - 1.8 mm (0.059 - 0.071 inches)
For power cables of bulkhead connectors
(cable exit direction towards motor shaft):
2 - 2.2 mm (0.079 - 0.087 inches)
For power cables of bulkhead connectors
(cable exit direction towards encoder):
1.8 - 2 mm (0.071 - 0.079 inches)
Step 2:
Place the (A) seals nut, (B) compression
ring, (C) rubber ring (with the bulge side
towards the housing), and (D) housing on
the cable in sequence.
Note: use the rubber ring corresponding to the
cable in order to meet the IP67 standard.
Power cable
Brake cable
Step 3:
Slide the heat shrink onto the cable, and
then crimp the terminal.
Step 4:
Shrink the tubing at a distance of 1 mm
(0.039 inches) away from the terminal.
Specifications of heat shrink:
For power cables: 5 mm (0.2 inches)
For brake cables: 10 mm (0.39 inches)
For shielded cables: 18 mm (0.71 inches)
Note: heat shrink is not required for the encoder
signal cable.
3-50
Send Quote Requests to info@automatedpt.com
Call +1(800)985-6929 To Order or Order Online At Deltaacdrives.com