3) Out of the box move the machine to the appropriate location
Upon opening the box, the worker should be equipped with the appropriate security
measures, such as safety helmet, gloves etc. This machine is heavy machinery, so be
careful when use the forklift. After moved to the corresponding location, then open the box.
Tip: out of the box, it is best to comply with the order from top to bottom.
When move the machine, please use the forklift or the flat dray.
After opening the box don't rush to install machines, you should first check box with the
equipment list, carefully check all the equipment in the box, if there are any missing, please
contact the supplier.
2. Adjustment
1) Horizontal Adjustment
To ensure the machine in the best working status, the horizontal adjustment is necessary. It
includes horizontal in front-to-rear and left-to-right level. Normally it is difficult to adjust the
horizontal level with the general gradienter, so we used pipe adjustment when installation.
The methods as following:
Set the reference point: take the printer table as the basis, four angle is set to a, b, c, d,
take the front right corner "a" as a reference point, adjusting the other three points "b, c, d",
enables them to achieve the horizontal position. As the following diagram:
d
c
a
b
Inject some water in the nylon tube, and adding a few drops of ink, so that to see the
water level;
The above work requires two or three people to complete. The left “a” reference point
requires one person handheld hose at the point “a”, one person handheld horse at the point
“b” and not move hose.
When all are ready, ask "a" point personnel moves up and down the hose, until the water
level of the hose in the the same place with point:a”;
Watch the level of point “b”, now point "b" will occur in two situations: one situation is the
water level in the hose is higher than point "b",it means point "b" too low, adjust the feet
under point “b”, to raise the "b" point;